CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Emissions Reduction

Instrument Gas to Instrument Air Conversion

Location: Oklahoma

The Challenge

The Client needed to convert the instrument gas devices at (4) natural gas compression facilities in Oklahoma to instrument air service in a 6-month period.

OOOO(b) requires that process controllers emit no identifiable emissions. Instrument air systems are inherently emissions free, so they are not subject to requirements specified in subpart 60.5390b.

The Solution

CANUSA EPC conducted site visits to audit all the instrument gas users at the facility, as-build the P&IDs for IA users, and validate facility electrical capacity to add an instrument air skid. Sizing requirements for the instrument air compressor skid were provided to account for all users and start air for the natural gas compressors.

The design and construction packages were executed in sequential order to meet accelerated schedule deadlines.

Engineering

  • Walk down (4) facilities
  • Instrument demand study
    • Start air evaluation
  • Instrument air skid specifications
    • Dual compressor design for
  • Recommend electrical upgrades

Design

  • Isometric riser details for IA user areas
  • Header design to account for future start air
  • Electrical and utility upgrades

The Results

Reduction in fugitive emissions and venting from previous IG users and compression start-up

  • Successfully achieved reduction of all instrument gas users
  • Calculated emissions reduction of 153 MTPY of methane
  • Compliance with OOOO(b) section 60.5390b
  • 25% reduction in engineering design on a site basis

Explore Other Projects

  • Emissions Reduction

    Tank Venting Emissions Reduction

    Harrison County, TX
  • Emissions Reduction

    Amine Vent Dispersion

    Douglas, WY
  • Emissions Reduction

    Turbine Seal Gas Capture

    Greeley, CO

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.