CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Well Pads

Central Tank Battery Expansion

Location: Walden, CO

The Challenge

The Client was operating an existing Central Tank Battery with an existing separator and heater treater onsite for servicing the production facilities. This CTB was also the sales point for the gas from the production facilities. The Client wanted to increase the storage capacity onsite by 5000 BBL and add Vapor Recovery Units to meet tank emissions requirements. There was also a need to increase the inlet capacity to treat production for two new pads, targeting on line production shortly after the expansion of storage.

The Solution

CANUSA EPC first engaged with site visits to understand the existing infrastructure onsite and determine how the operations team had previously built the existing assets.

Our team provided as-built documentation of the existing facilities after the completion of a site visit. The construction design scope included:

Engineering:

  • Facility plot plans and containment sizing for new tanks
  • P&IDs of the facility
  • Generation of pipe valve and fitting material based on the P&IDs
  • Mechanical tie-in of a new VRU to meet Colorado AQCC Reg 7
  • Area classification updates
  • Single line updates
  • Design of an electrical system for the expansion
    • Electrical
    • Controls
    • Instrumentation

The Results

Design and expanded two Central Tank Batteries

Designed expansion of an existing production facility and a new greenfield pad

Reusable equipment

  • Provided onsite support of equipment walkdown for existing package redeployment

Designing for expansion capacity

  • 900 barrels of added field production
  • Existing electrical systems were evaluated to handle future needs for pumps and VRU packages

Explore Other Projects

  • Well Pads

    Heavy Oil Battery

    Marten Hills, AB
  • Well Pads

    Oil Terminal Expansion

    Killdeer, ND

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.