CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Well Pads

Heavy Oil Battery

Location: Marten Hills, AB

The Challenge

Additional oil production from the Clearwater formation required our client to increase the processing capacity of an existing heavy oil battery from 8,000 BPD to 15,000 BPD. Due to the future plans to convert the field to waterflood, the upgraded battery equipment needed to be adequate to handle future water volumes. Functionality for crude oil blending with condensate and NGL was required to meet RVP, density, and viscosity specifications in the sales oil pipeline.

The Solution

CANUSA EPC was contracted to offer Engineering, Procurement and Construction Management (EPCM) services.

Developing a Plan to Meet Client Expectations:

  • Leveraged CANUSA EPC’s previous battery design experience
  • Developed a DBM to manage design expectations
  • Developed a PEP and schedule to efficiently manage execution

Sourced New Equipment:

  • Oil and Water Tanks
  • Electrostatic Heater Treater
  • Glycol Boiler and Cooler
  • Waste Heat Recovery Building
  • LACT Sales Oil Booster Pump
  • Sales Oil Blending Package

Execute Value Engineering to Support the Project Schedule:

  • Identified operational improvements for the upgraded battery
  • Automated tank selection and facility de-sand
  • Rectified deficiencies discovered in the existing battery during construction

The Results

  • Increased oil production from 8,000 BPD to 15,000+ BPD
  • Lowered emissions of produced oil
    • Implementation of a VRU to the tank farm
    • Utilizing electrostatic treater to reduce energy and chemical requirements of treating oil
    • Waste heat recovery reducing overall plant fuel gas consumption
  • Operations improvements

Explore Other Projects

  • Well Pads

    Oil Terminal Expansion

    Killdeer, ND
  • Well Pads

    Central Tank Battery Expansion

    Walden, CO

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.