CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Gathering System

Pipeline System Expansion

Location: Montney, BC

The Challenge

British Columbia has stringent pipeline regulations and the geography presents harsh weather and steep/diverse terrain. Due to the project’s construction size, nearly 60 vendors were required over the 10+ month schedule. With various constructability issues, especially pertaining to hydrotesting, de-watering and purging operations, the Client required a team with experience and the right tools to complete the project.

The Solution

  • CANUSA EPC provided a single point of contact for all 59 vendors
  • Designed and coordinated to safely cross large rivers while meeting all environmental regulations
    • Septimus NPS 8 sales gas and gathering pipeline loop (combined 9,800+ meters; river crossings)
    • Monias NPS 12 sales gas, NPS 6 natural gas and NPS 6 liquid pipeline constructions (combined 55,600+ meters)
    • Saturn NPS 16 sales gas pipeline construction (combined 23,900+ meters; river crossings)
  • Design of the pipeline pigging facilities for 900 ANSI system under CSA specifications
  • Daily, weekly and monthly project reporting including budget, schedule, safety and quality
  • Sweet natural gas and condensate pipelines were constructed as spare bi-directional lines for future production

The Results

  • Improved capacity and flexibility of the gathering and sales pipeline system
  • NPS 16 sales gas pipeline connected the NPS 12 pipeline from existing gas plant
  • Transported sweet natural gas from the field to the existing gas plant – allowing for incremental gas production
  • Provided flexibility for Client logistics with bi-directional designs

Explore Other Projects

  • Gathering System

    120 MMSCFD Compressor Site Expansion

    Gillette, WY
  • Gathering System

    Greenfield Compressor Station

    USA
  • Gathering System

    Greenfield 50 MMSCFD Compressor Station

    Northeast BC

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.