CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Well Pads

Oil Terminal Expansion

Location: Killdeer, ND

The Challenge

The Client needed to design and install an additional oil sale point in the DAPL pipeline for a capacity of 1000 BPH. The existing facility had an existing 480V utility drop that would need to be utilized for 600 HP motors.
The Client was executing the project through an approval process requiring engineering definition to a Class 3 estimate before completing the design for construction.

The Solution

CANUSA EPC provided engineering and procurement services to the Client to expedite the project schedule.

Engineering:

  • Site visit to inventory repurposed equipment
    • FEED Study including TIC estimate
    • Full discipline engineering and design
    ▪ Installation of a repurposed pump skid
    ▪ Electrical meter connection
    ▪ Meter run specification
    ▪ 20” Pipeline section to DAPL connection, including
    launcher/receiver
    ▪ ARC Flash updates
  • Construction designs for skid equipment installation strategy

Procurement & Project Services:

  • Schedule, budget, and scope management with our project services
  • Specification of valves, meters, pig launcher
  • Bid solicitation of electrical switchgear, motor-operated valves
  • Bid analysis from vendor submissions
  • Expediting

The Results

  • Client site increased sales capacity to new pipeline connection at a rate of 1000 BPH.
  • $2.5 Million USD budget managed
  • Utilized existing pump skids to reduce the total cost of the project.
  • Provided support through construction for client facility startup.

Explore Other Projects

  • Well Pads

    Heavy Oil Battery

    Marten Hills, AB
  • Well Pads

    Central Tank Battery Expansion

    Walden, CO

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.