CANUSA
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Our Approach
    • Concept Development
    • Project Definition
    • Design-Build
    • Client Testimonials
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Gathering System

Composite Pipeline

Location: Gift Lake, AB

The Challenge

Current development plans in the area required our Client to replace truck-in propane with pipeline quality fuel gas at their wellsite’s and battery facilities. To accommodate further development plans in the area, the pipeline required provisions to tie-in to future wellsite’s, batteries and pipeline segments.

The Solution

CANUSA EPC provided full discipline engineering to develop the construction packages for the Client.

  • Developed a plan to meet Client expectations
    • Leveraged previous pipeline design experience
    • Leveraged in-house process and design experts
  • Sourced materials
    • Pressure control valve
    • ESD valve
    • Carbon steel to HDPE transition pieces
    • HDPE line pipe and fittings
  • Executed value engineering to support the project schedule
    • Designed and implemented over pressure protection and pressure control to connect pipelines with different MOP’s
    • Worked with AER to expedite the pipeline license down from 6 weeks to 1 week

The Results

  • Provided construction with a detailed work package
    • Installed 14 km of new fuel gas pipeline tying into 9 wellsites and 1 existing pipeline
    • Installed risers and blinds for future wellsite tie-in’s
  • Construction executed with minimal environmental impact
    • Pipeline was installed by plowing, minimizing disturbance to the surrounding area
    • Water course crossings HDD bored to minimize ecological impact

Explore Other Projects

  • Gathering System

    Pipeline System Expansion

    Montney, BC
  • Gathering System

    120 MMSCFD Compressor Site Expansion

    Gillette, WY
  • Gathering System

    Greenfield Compressor Station

    USA

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Our Approach
  • Concept Development
  • Project Definition
  • Design-Build
  • Client Testimonials
  • EPC Resources
  • Solutions
  • Natural Gas Processing Plant
  • Onsite Power Generation
  • Well Pads
  • Gathering System
  • Carbon Capture
  • Helium Development
  • Emissions

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


United States Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States

© CANUSA EPC.